I have never seen any instructions requiring the use of No-Alox.
Unless required by the instructions, the NEC does not require its use.
I have never seen any instructions requiring the use of No-Alox.
Unless required by the instructions, the NEC does not require its use.
My experience was in the late 80’s, working for a contractor.
I doubt he went by the NEC, he was an old timer, and was a General Contractor. He probably just heard it somewhere, and passed it on to the crew at the time