‘day 3’, est cost $13,500
soil on bank along trench n so, if it rains one is asking for trouble, aka cave in.
some trenches cave in with out adding additional risk = soil along open trench
‘day 3’, est cost $13,500
soil on bank along trench n so, if it rains one is asking for trouble, aka cave in.
some trenches cave in with out adding additional risk = soil along open trench
Hope he has good lungs. That mask won’t do much good around his neck.
and they have the shitty soil/backfill on tarps so looks like they plan on backfilling with that ‘crap’ = not a good idea lol
looks like a pretty poor gold mining operation from Ohio…just sayin…
if You plan on putting all that clay back in the trench, why bother digging in the first place ?
Not much sense in that video Jim.