I am a homeowner who hired a contractor to repair a 100 year old concrete pier that extends about 50 feet into a freshwater lake. The lake freezes in late December/January, and when it thaws in the spring, huge sheets of ice float across the lake and crash into the pier.
The repair project consists of installing a 6” wide cap on the sides of the pier, which has been done, after which a 6” cap will be poured on the top.
I am not an expert on concrete construction, nor am I an engineer, but I am concerned about what I believe are some cold seams in the newly poured sides of the pier.
For reference, the contractor poured footers around the pier with rebar, after which forms with rebar were erected for the 6” walls. During the pour, the contractor used a vibrator behind the hose from the pump truck, but perhaps did not vibrate deep enough or in enough areas. In case it matters, nothing else (like a building) will be constructed on top of the pier.
I am attaching photos of some of the areas I am concerned about. Although the areas are not attractive cosmetically, I am more concerned about whether these will be weak areas that will be more vulnerable to damage from freezing temperatures, water incursion, and impacts from ice floes.
If these are not a big deal, that will be a huge relief to me. If I need to get a consultant to look at them on site, I will. If they are merely cosmetic flaws, I will work with the contractor to figure out how to address them.
Will the dimensions be the same? Did they remove material?
Or is the contractor is making the seawall 6" inches thicker on both sides and 6" inches higher?
Hi Andrew - Thanks for the question. Did you hire a design engineer or architect to produce the design for your project? If so, they can likely give you some project oversight for construction quality. I would see about getting them to look at it for you. Alternatively, I would consider hiring a local engineer to take a look.
Overall, it is normal to have some degree of lack of consolidation of concrete when you remove the forms. Good construction practices help minimize these. When there is a lack of consolidation (honey combing or cold joints), the typical course of action is to coat them with mortar afterwards. This helps to seal the surface of the concrete and improves the visual appearance. When consolidation is very bad, you hire an engineering/inspection company to core drill your foundation to see how bad it is. For very bad consolidation, you remove the poor quality work. I don’t think what you have is very bad quality. But if this is important project for you, I don’t think it hurts to hire a local engineer to give you his professional opinion. Good luck with your project.
Robert, thanks for the quick attention. The contractor did not remove any material. Instead, they are making the pier 6” wider on each side and the end, and on the top.
William, thanks for the helpful guidance. I did not have an architect or engineer consultant on the design. Basically, a 6” cap (a bit larger on the end) was all that the permitting officials would allow.
It is an important and costly project so I wanted it done right. It requires the use of a cofferdam, so correcting mistakes months later would be an expensive proposition.
I concur with Jeff Spencer.
Retain an engineering firm that has a decent portfolio of seawalls.
That is one expensive engineering project. Just to get permission for a Cofferdam must have involved local authorities. I put a bid on a sea wall repair on a lake and the owner and I were surprised at what the authorities required.
I am surprised the contractor did not have a inhouse structural engineer on call to review certain steps. Including sump testing. Double check with the contractor.
As to your post; Robert, I assume the colors are different because they came from different trucks?
I will remain mum on this.
dcossar1
(Douglas Cossar, Life time member CMI. NHI)
13
Andrew: This is a forum for home inspectors. It is not an on-line help page. Get proper qualified advise from proper sources.
Andrew can you provide any pictures that show the overall site? Having close up photos are great, however some things would make more sense if I can see a bigger picture. Based on the photos already provided, information shared and terminology used, I have some questions.
Was this new wall formed up on one side only and the concrete poured against an existing wall? From what I can see, some of it appears to have been done that way.
Did the contractor give you copies of the concrete batch tickets?
The contractor attempted to pour the wall in lifts which is common practice for one sided formed walls, however there is evidence of various slumps that were poured. Were there gaps in between the arrival times of the concrete trucks? If so, how much time were the gaps?
It appears that some smooth rods and some rebar pieces are protruding quite a ways out the wall. Can you elaborate on these?
Let’s talk about the mix, if it truly was a 5000 PSI mix, it would be at least a 7 sack mix design with plenty of water reducing admixtures. Considering the application, a higher PSI mix wouldn’t necessarily be better to ward off ice sheets as they can damage even the highest PSI mix designs. Air entrainment and/or other admixtures would be more important if it were to be submerged or just partially submerged. The PH, KH (hardness), and types of dissolved minerals in the lake water can affect concrete in many ways. So, with that being said, the mix used should have been designed for this specific application.
If the cold joints penetrate enough that lake water can get to the rebar, or are in the freeze zone of the lake surface, they can be an issue over time. Again, the water quality of the lake will be a factor. Simply grouting the surface at this point won’t necessarily fix anything either. If grouting is not done while the concrete is still “green” and very shortly after the forms are removed, freeze thaw cycles will eventually cause it to flake off, as there will not be a good enough bond between the grout and the concrete to stand the test of time. I’m not saying that grouting the surface is not an option to help fill gaps and holes, it’s the application methods and timing that matters. If it applied 24 hours or more after the forms have been poured, a bonding agent will need to be used in order to make it last and hold up.
Now, the color….. Based on the pictures provided, I only see one issue. Various parts of the wall were poured at different slumps. Slump is how wet the concrete is. Higher slumps created by adding water have a tendency to be a lighter grey/green color than lower slumps of the same mix design. I can clearly see some areas that were literally soup when placed, and others that were dryer. Some other things that can affect color are: Concrete of the same exact mix design coming from different batch plants can result in different colors as the aggregates used can vary and will play a part. Different mix designs or batching new concrete into a truck that contained leftovers from a previous load can affect color. Form material can affect color. Form release agents can affect color. Using Portland Cement from different suppliers can affect color. Quantity of fly-ash in a mix can change the color. There are many other things that can change the color of concrete as well, but these are the most common.
As other’s have stated, find an independent person like an engineer to check it all out before things get too far along. . . . .
I forgot to mention before why high slumps can be an issue. If slump is increased by adding water, it changes the water/cement ratio. Change it too much by adding a lot of water it lowers the overall PSI of the mix and essentially weakens it. If the mix contains fly-ash, the fly-ash can segregate as well leading to areas that are weaker than others. If type L1 cement is used, the additional lime stone in the cement has a tendency to separate at higher slumps too. Bottom line is, “soupy mud” is no bueno unless the mix is designed to be poured in that manner… I could get into the whole chemistry thing with it all, but it would take way too long to explain it. Besides, most of that information can be found online without a whole lot of effort….