CSST through floor

Anyone have a reference or a diagram for running CSST through floor penetrations (unprotected)?

Kevin

Kevin,

Try this www.gastite.com

The IRC requires striker plates when CSST passes through framing and is closer than 1 1/2 inches of the surface.
The UPC requires strike plates for all penetrations.
Of course, local codes and manufacturer recommendations can change all of that.