Foundation Over Pour

1997 build.
When the home was originally designed, one of the designs called for an additional 3 x 15 foot extension.

When the home was built, the room extension was not incorporated therein.
Basement is fully finished with no visible access to this extension from the basement.

A deck was then constructed over the area, deck framing is boxed in beneath so there is no visible access to really determine how, and/or why this was done.

It looks really strange…

2nd photo, crack in basement wall.

And how about that thin, sorry az damproofing loool!

Lots of cracks, lots of leaks… some fixed… most not…
Inspection Over … No Sale…

Joseph the deal killer.