Gap behind weep screed

During an inspection, I found gaps along the exterior wall behind the weep screed. In the gap, it is notable that the OSB and the sill plate were exposed. According to the code R602.3.4 bottom (sole) plate; “the wider exterior wall bottom or sill plates may be cantilevered a maximum of one and one-half (38 mm) inches from concrete slab-on-grade to accommodate slab-on-grade perimeter insulation if the remaining bearing is sufficient to carry the structural concrete.”. My question is, what about this gap? Is it required to be sealed up?

Raul, it would be helpful if you would post pictures.

Thank you.

2 Likes

Photos will help.

1 Like

Any photos yet?

:rofl: :rofl:

Don’t hold your breath. He/She looks to be an ‘old’ Newbie trying to catch-up on his/her courses!

Image please.

I am always intrigued by the hit and run posters.

1 Like

An attribute of ‘Social Media’ wannabe’s.

it looks great from ohio……

3 Likes