Good illustration.
How often do you see 3-Phase Service in Residential? Is that a Colorado thing?
It is rare in every state I’ve ever inspected in, and usually only when there is a Shop Grade air compressor and/or AC welder in a farm barn/machine shop!
This year I had 25,500 run to the property underground, then I stepped that down to 480, then I stepped that down to 208/110 and 3-phase at my stable.
Yep. It would be hard for me to live without 3-phase in the shops.
So how’s about making another graphic without 3-phase service, (which would be of more use), for the average property?
Any member can ask for any graphic they want, as many as they want. Submit to [email protected]. Most of what you see came from member requests. This one was from a CCPIA member.
Maybe once in a lifetime.
You’re old ![]()
I see roughly a couple a year… almost always in a scenario such as Nick’s, just not as nice.
There are 2 neighborhoods in Tulsa that are wired with 3 phase that I am aware of. Both were developed in the 1950’s. Most have changed everything over to single phase except the AC condenser units.
Some utilities do not allow grounding at the meter socket.
The rod should also be flush or below grade. There are also other options of grounding commerial structures including the use of building steel. It would also not be uncommon for the structure to have a CT cabinet that this graphic does not shown.