ICC IRC B1 Chapter 5

  • How must lots be graded? What is the minimum required slope of the grade away from the foundation?

  • A lot must be graded so water shed moves away from the structure. The minimum grading for water mitigation is sloping away from structure at 6 inches over 10 feet.

And what do you do if you can not make a 6” drop in 10’??

1 Like

An amount that prevents stormwater from creating damage to the structure.

The sandy soil in my region has different properties than the clay soil of a different region.

1 Like

here in Florida its every 10 ‘from slab or foundation, it can’t drop more than 6’’