-
How must lots be graded? What is the minimum required slope of the grade away from the foundation?
-
A lot must be graded so water shed moves away from the structure. The minimum grading for water mitigation is sloping away from structure at 6 inches over 10 feet.
And what do you do if you can not make a 6” drop in 10’??
1 Like
An amount that prevents stormwater from creating damage to the structure.
The sandy soil in my region has different properties than the clay soil of a different region.
1 Like
here in Florida its every 10 ‘from slab or foundation, it can’t drop more than 6’’