Any reason one can think of so many pipes sticking out. I can’t image all of them are observation ports/ cleaning ports. 12 total pipes.
They’re Drain-field Vents, prolly due to the hilltop location.
they where all capped, no visible holes for venting.
That is really odd in our area to have so many pipes sticking up out of the drain field. My drain field has two small pipes, one on each end, cut flush with the ground and capped. These are basically inspection ports if needed. It would be very unusual (but not entirely unheard of) for a drain field to need “venting.”
My recommendation would be to have the client contact the installer to inquire about the pipes. Most counties have the installer and the septic design on record.
they are getting a guy out to test and check the septic and field.
*I’ve seen 3 or 4 pipes, never this many, very strange.
Only time I’ve seen that many was at a land fill or an underground guberment facility. ![]()
It may have something to do with the soil conditions at that site. Low permeability soil may require a much larger leach field and more inspection tubes.
Personally… I would advise the Client to go directly to the County Health Department for COPIES of all Documents regarding the Private Waste System, and the Private Potable Water Well, (Both of which should have been included with the Abstract when purchasing the property!
Depending on the TYPE of Drain-field, (most now-a-days are Mound Systems), they are often (and if a Mound system, is REQUIRED), may be required by law to be ENGINEERED and CERTIFIED by a State licensed Septic Engineer!