Internachi’s pre-drywall construction contract states, “You will pay us in three equal installments. This first payment is due when you sign this Agreement. You will make the second payment when we complete our second inspection. You will make the final payment when we provide you with our final report.”
The contract goes on to say, “We will perform a visual inspection of the construction and residence in three phases. The first two inspections will take place during the post pour / pre drywall phase, and we will provide a written report after each inspection.”
I am in the process of creating a HI business. My background (carpentry/remodeler and structural engineering with a specialty in residential) leaves me most familiar with new construction, so I am hoping to optimize on this aspect (particularly early on). With that said, I want to make sure I am understanding this correctly.
Questions:
You will make the second payment when we complete our second inspection.
I presume the second inspection is performed to confirm that all outstanding items from your first inspection have been completed? I followed behind a lot of HI’s to provide repairs for their findings on their first reports. It was my understanding that they would often check that the repairs were made per our specifications.
How do you guys format your second report? Do you have a verification template? For engineering letters, do you say they have been completed per the EOR’s specs?
For an engineering letter, I would have said something like, “Page 23, item 4a of XYZ’s Home Inspection report notated a damaged gusset at joint 5 of the 2nd A5 roof truss from the left. The contractor shall…” Or if I was there to verify my own repair (or another engineer’s repair) I would say, “At joint 5 of the 2nd A5 truss, the contractor…The repair has been satisfactorily executed per XYZ Engineering’s specifications.” This is all compiled in a word document with a letterhead and is sealed at the bottom. Is this at all similar to a second report for a home inspection?
You will make the final payment when we provide you with our final report.
At this point, I am assuming you guys are double checking all of the components plus the appliances? They’ve also adjusted the grade at this point, so checking that drainage is sufficient. Further, if there were outstanding items from the 2nd visit, you would confirm their completion here.
In general, I am curious to hear about y’alls process overall for pre-drywall. Are three separate inspections considered extraneous by your clients or is that most valued? What kind of templates are y’all using?
How much time does it take you guys? For a structural inspection of a 2-story home (say 3k to 4k sqft), I can easily spend two to three hours with the building plans/truss packets/layouts. Just depends on the house. That still leaves the remaining trades.
How often do y’all get the building plans? If plans aren’t available, do you ever find the same model under construction and knab those plans (or take pictures of them for reference)?
I offer pre-drywall and final/post drywall inspections.
They can be alone or together. To me they are simply two inspections however, I offer a discount if they agree to both. I do a handshake deal, I’m not going to try to legally lock someone into the 2nd. Both together are way more than a single inspection would be, and the discount for each is cheaper than they can find a single inspection for and when I do a good job on the first, they’ll come back anyway.
Since I’m familiar with the property, the final is usually quicker and pre/post you can’t generally get on the roof, so it’s a fairly straightforward inspection. I do use my camera pole on the pre-drywall and don’t do anything on the final(regarding the roof) except take more pictures.
Mark, thank you for taking the time to read and reply. Highly appreciated!
I also have to give you credit for being perceptive. Overthinking is my M.O.
Okay, so what I gather is you agree to a single inspection. If they want additional inspections then you oblige and offer discounts. That seems fair and more closely resonates with what I feel is realistic.
I was wondering if the three inspections referenced in the contract was the status quo, but I am happy to read there seems to be a general consensus that says otherwise. Great!
Yes, I can’t imagine what a third inspection would be like that isn’t a trade specific one. I mean, I’m not going to inspect an empty lot or the concrete pad with no structure on it. That kind of thing. I’m not saying those are inspections that don’t need done, they do. They need done by the AHJ. I’m not an engineer testing the PSI of the concrete or the load bearing capability of a beam or truss.
I’m checking for the plumbing, the studs, the WDO treatment, the placement of nail plates, the air handlers and ducting, etc. There’s a ton of things that need to be there and be square in a pre-drywall.
The final is essentially just a new build check off. I do check all windows, I do check to make sure toilets fill fast enough. I do check to make sure that no debris found it way into the plumbing system and has clogged all the fixtures(it’s happened). It is essentially a full home inspection, but I’ve been here before, and I know what I’m looking for. Fit and finish, check mechanicals. Fairly straightforward.
+1 for what Brian said…I don’t do pre-drywall but it is not our job or scope to confirm that something has been done appropriately. That opens you up to liability issues.
We only note when there is a defect such as a safety hazard or that something is not functioning as intended. In new construction / 11th month warranty inspections, we may also include craftsmenship/cosmetic defects but as home inspectors, we defer to the appropriate trades (even if you have experience in the trades).
You are not required to use the NACHI contract word for word. You can modify it to suit what and how you want to do your business. My inspection agreement is a compilation of many agreements that I’ve encountered over the years.
I’m with @lhenderson2 regarding your agreement. I use the nachi agreements but have customized them all, including addendums. Some I even wrote from scratch. As far as payment, set it up however you want…
On repairs, I am with @bcawhern1 . Remember, as an HI you are a generalist. If you see a defect, note what you see and move on. Don’t set yourself up for a liability suit.
You have to keep in mind your state SOP, if there is one.