Todays inspection was 6 months after their close, it took 25 months for them to close (before all the BS started a few years ago, new homes in this area were thrown together in about 3-4 months. The master bathtub area still had exposed wall framing, incomplete plumbing fixtures, ect and has been replaced 3 times. From the clean out at the beginning of the inspection the main sewage drain was half filled with sewage. At the end of the inspection the drain line was flooded and almost over flowed the cleanout. We stopped our normal protocol and shut down running water to keep it from flooding showers. This is just the tip of the iceberg of the issues with this house