Phrasing for a flat roof eval

Single layer BMU flat roof. This roof has had no maintenance done. Some granual loss and two small areas where the seams need attention. As a contractor, I would recommend to the customer, coating with an approved siliconized elastomeric coating or a 100% silicone coating. As an inspector this seems to fall outside my purview. In the inspection report I could phrase it as, “In need of maintenance and repair” thereby allowing the homeowner to use a Handyman, roofer, or even do it themselves as long as the coating manufacturers instructions are followed to the letter. This is not a high skill matter like for shingle repair or the like. …

Or I could say “In need of further evaluation and correction by a licensed roofing contractor”

This increases the cost of remedy to the homeowner.

Which way should it be phrased?

It should be phrased in a manner that guides the client to a proper solution by the most qualified entity with no regard for cost.
It is not your place to make those determinations for your client. They can make whatever adjustments they wish for themselves, but you must always look out for their best long term interests!

5 Likes

By your answer of “most qualified”… if a light bulb is out an egress from a house or to a staircase then it would need to be done by a licensed electrician because this is a safety issue in need of correction

“Most qualified” to ensure the properly trained contractor actually evaluates and repairs the concerns… NOT a friggin Handyman or DIY’er!!

Seems I was incorrect in using the term BMU. It is single layer asphalt roll roofing with two unobstructed edges for drainage.

In this reply you are using the term “Evaluate…” I can totally understand saying in need of further inspection and evaluation by a Licensed roofing contractor. That was in my original post/question. Understand, I have over 40 years construction experience and it does influence my thinking as I am making my way through the first classes on becoming and inspector.

Due to observed age and wear, the roof covering appears to be nearing or at the the end of it’s useful life. The covering has failing seams and granular loss.

Recommend immediate repair/maintenance by a qualified roofing contractor.

Recommend budget for replacement accordingly. (Note: Client may consider a quality roof coating system in lieu of replacement. Contact a specialist)

On a side note. I’ve removed all references to DIY in my reports. If they want to take a stab at it, they don’t need me to tell them. And I don’t need to concern myself with their competence.

3 Likes

Thanks that to me is a perfect response :slight_smile:

What report software are you using? Most have all the narratives you would need on a daily basis. Just keep it simple, also I rarely use the word evaluation. As that is what you are there doing. Only in special circumstances maybe I’ll recommend further evaluation.

This is a torch down roof, known as modified bitumen. It is not asphalt.

1 Like

I am still just taking the classes to become an inspector. For one of the essay homeworks, I encountered this roof. This roof was only 30 months old. I do a lot of work in the area and these flat roofs come no where near the expected life. Extreme high temps, sun, and a tropical storm (sometimes hurricane) or two every year. Few people know that it is good practice to coat them once the intial installation has had time to outgas.

Travis - the other reason you do not want to prescribe a fix…..If you do clearly explain the roof issue and how to fix it, then the person getting the report made may opt to use your repair verbiage as a guide, and then if it DIY fails, they will look to your info as wrong, and potentially you can be held responsible for the guidance, even if they did it wrong.

It can become a not so goof liability thing if you are recommending fix methods. Hopefully that is clear.

2 Likes

You really do not want to apply a coating to modified bitumen. The coating itself can cause damage to the roofing material through chemical reactions. Coatings are made for asphalt roll roofing, epdm and tpo. Unless you find a manufacturer approved coating. But there is no reason to cost it, that is why the cap sheet has embedded granules. As uv protection. Very little goes wrong with a torch down roof if applied properly with a smooth base sheet and granular top sheet, And properly primed flashing.

As a contractor you should know your material and the application process.

I was an owner/operator who applied roof coatings over hundreds of thousands of square feet covered with various materials. Torch down, modified, metal, PVC, TPO etc. are often very good candidates for coating. The coating has a few primary advantages. 1) Extends to the life of the roof covering and UV protection. 2) Leak repair. 3) Can be reapplied without adding significant weight. 4) Cost efficiency. 5) Added energy savings

Generally we applied coatings to extend life and stop leaks. Though there were other reasons, notably energy benefits of a cool white reflective coating.

Not all products are the same. Elastomeric ceramic or silicone is currently an effective product. Interestingly, based on the one photo, I see nothing that justifies any action.

1 Like

Travis, all of these replies merit consideration. But keep in mind that it is not your job to determine how things get fixed, by whom, or by when. Cost of repair is also not appropriate in the report. It is addressed in most SOP’s. Regardless of how you state it, what you choose to say indicates to the reader the severity of your observation.

It really gets out there when a HI calls out for a Licensed Contractor or Engineer for things insignificant. A crack in the driveway goes not require a Geologist! This practice is generally the HI trying to get the monkey off their back.

You may find in your SOP that the following is “Required Reporting” (though I never see it done).

(v) State whether the condition reported requires repair or subsequent
observation
, or warrants further investigation by a specialist;

Things broken need to be fixed.

Subsequent Observation are things, like this roof. It looks like things are happening, but it is still doing it’s job by not leaking.

Further Investigation is not because a HI does not like what something looks like to them, or something they would not want in their house. It is a visual deficiency you observe but do not have the time, equipment, training, or not in the SOP as required reporting. There is something there but it takes someone else who is competent for more evaluation.

I recommend you use these three as intended.

2 Likes

A good (and related) example of this would be Core Sampling of a Roofing System.

This reply helped alot. Not just for the example I was giving, but why I have had an HI require a Licensed Roofing Contractor to caulk 8 exposed nails on shingle roof caps. (Yes this really did happen.)

What is your objection? That the HI recommended a repair for a de minimus item, or that the HI recommended the repair be performed by a licensed roofing contractor?

By a licensed roofing contractor for caulk. Didnt say further eval or anything like that.. just caulk the nails. .. Keep in mind I am usually working for the seller in real estate transaction, but the HI works for the buyer. 99.9% of the time the HI is dead on or missed things I personally (not as an HI ) would have made note of if I were working for the buyer. But once in awhile you get a report that is asking for something ridiculous. In this case the seller had to pay a roofing contractor $400 to come out for 15minutes and caulk 8 nails, in order to make the buyer happy.

1 Like

I get it. Good points.

But allow me to expand.

  1. The seller didn’t have to do anything. It’s a negotiation.
  2. The home inspector works for the client. The home inspector has a range of recommendations, DYI, handyman, qualified contractor, licensed contractor, etc. A home inspector must make a judgement each time. Generally speaking, the home inspector is going to remove guesswork and recommend what he believes will serve his client best with as few variables as possible. And, no one puts amateurs on roofs
  3. At that point, he is removed from the transaction and the vested parties sort it out.
  4. The seller likely had room to negotiate for repairs and this satisfied both parties. And if something goes wrong with the roof, there is a reputable contractor to connect with for correction or future business.
2 Likes