I have a raceway with two service panels on either side of the raceway. Each panel has 150 amps disconnect. There is only one meter box to the house. My question is, what is the correct discription of this service? Is this a 150amp service or a 300 amp service?


Originally Posted By: lkage
This post was automatically imported from our archived forum.



Sounds like (2) 150 amp sevice panels.


Originally Posted By: Greg Fretwell
This post was automatically imported from our archived forum.



I bet it is served like a 200a