# Rafter connection for catherdral ceiling?

**URL:** <https://forum.nachi.org/t/rafter-connection-for-catherdral-ceiling/42919>\
**Category:** Structural Inspections\
**Created:** [October 9, 2009, 12:18am UTC](https://forum.nachi.org/t/rafter-connection-for-catherdral-ceiling/42919 "2009-10-09T00:18:10Z")\
**Posts on this page:** 8\
**Page:** 1

<div class="post-metadata">

**Author:** ![pcoulter](https://avatars.discourse-cdn.com/v4/letter/p/57b2e6/32.png) [@pcoulter](https://forum.nachi.org/u/pcoulter)\
**Post date:** [October 9, 2009, 12:18am UTC](https://forum.nachi.org/t/rafter-connection-for-catherdral-ceiling/42919/1 "2009-10-09T00:18:10Z")

</div>

The rafters for the “cathedral ceiling” in this addition appear to only abut one another at the top of the rafters. You can see the gap in the attached photos. 1/4" plywood was used to tie them together. There were no visible signs of the roof/structure having been compromised. Can anyone tell me if this is an acceptable method of tying them together? Thanks.

 ![IMG.jpg](https://global.discourse-cdn.com/internachi/original/3X/4/e/4e44b068f7c994cafe0d84d4f4f9202962f01f19.jpeg)

 ![IMG_4161.jpg](https://global.discourse-cdn.com/internachi/original/3X/0/a/0ae26c54db38d6ad6818864d7c4e4aa2a8dd0852.jpeg)

---

<div class="post-metadata">

**Author:** ![Richard\_A.Hetzel](https://avatars.discourse-cdn.com/v4/letter/r/8edcca/32.png) [@Richard\_A.Hetzel](https://forum.nachi.org/u/Richard_A.Hetzel)\
**Post date:** [October 9, 2009, 12:50am UTC](https://forum.nachi.org/t/rafter-connection-for-catherdral-ceiling/42919/2 "2009-10-09T00:50:13Z")

</div>

A better choice would have been a steel strap on top of the rafters…I beieve Simpson makes such an item for exactly that purpose. I have my doubts about 1/4-inch plywood used as a tie, but that’s just a seat-of-the-pants reaction.

---

<div class="post-metadata">

**Author:** ![mcyr](https://sea2.discourse-cdn.com/internachi/user_avatar/forum.nachi.org/mcyr/32/173319_2.png) [@mcyr](https://forum.nachi.org/u/mcyr)\
**Post date:** [October 9, 2009, 1:08am UTC](https://forum.nachi.org/t/rafter-connection-for-catherdral-ceiling/42919/3 "2009-10-09T01:08:22Z")

</div>

That is a screwed up design and connection.

They should have had a ridge beam or a bolted steel connection to counter act the rafter spread from the load of the roof.  
Recommend a structural engineer. 🙂

---

<div class="post-metadata">

**Author:** ![pcoulter](https://avatars.discourse-cdn.com/v4/letter/p/57b2e6/32.png) [@pcoulter](https://forum.nachi.org/u/pcoulter)\
**Post date:** [October 9, 2009, 1:27am UTC](https://forum.nachi.org/t/rafter-connection-for-catherdral-ceiling/42919/4 "2009-10-09T01:27:55Z")

</div>

Thanks, Marcel. Much appreciated! Have a great weekend!

---

<div class="post-metadata">

**Author:** ![dbelmont](https://avatars.discourse-cdn.com/v4/letter/d/ba9def/32.png) [@dbelmont](https://forum.nachi.org/u/dbelmont)\
**Post date:** [October 9, 2009, 3:48am UTC](https://forum.nachi.org/t/rafter-connection-for-catherdral-ceiling/42919/5 "2009-10-09T03:48:33Z")

</div>

Needs an engineer in terms of reporting.

No resistance to rafter spread. Either a weight bearing ridge beam or appropriate ties that would in effect make each rafter pair a truss would have been my choice as the builder.

---

<div class="post-metadata">

**Author:** ![dhelm](https://sea2.discourse-cdn.com/internachi/user_avatar/forum.nachi.org/dhelm/32/2090_2.png) [@dhelm](https://forum.nachi.org/u/dhelm)\
**Post date:** [October 9, 2009, 3:02pm UTC](https://forum.nachi.org/t/rafter-connection-for-catherdral-ceiling/42919/6 "2009-10-09T15:02:51Z")

</div>

Structural ridge is required in this kind of construction. Marcel, as usual, got it right.

---

<div class="post-metadata">

**Author:** ![wwilson3](https://sea2.discourse-cdn.com/internachi/user_avatar/forum.nachi.org/wwilson3/32/58197_2.png) [@wwilson3](https://forum.nachi.org/u/wwilson3)\
**Post date:** [October 9, 2009, 3:07pm UTC](https://forum.nachi.org/t/rafter-connection-for-catherdral-ceiling/42919/7 "2009-10-09T15:07:47Z")

</div>

He is the man! MARCEL CYR HOME INSPECTION ASSOCIATION  
MCHIA GOT A RING TO IT

---

<div class="post-metadata">

**Author:** ![mcyr](https://sea2.discourse-cdn.com/internachi/user_avatar/forum.nachi.org/mcyr/32/173319_2.png) [@mcyr](https://forum.nachi.org/u/mcyr)\
**Post date:** [October 9, 2009, 7:35pm UTC](https://forum.nachi.org/t/rafter-connection-for-catherdral-ceiling/42919/8 "2009-10-09T19:35:34Z")

</div>

:)You guys crack me up. :mrgreen:
