In section 14.12 in the mechanical draft section it states “The vent termination of a mechanical draft system must be at least 7 feet above ground level” but then a few sentences later states “The vent termination must be at least 1 foot above ground level”. Am I missing something or is this just a typo? Which is correct?
Also in 6.8 it says “The amount of pressure loss caused by friction is affected by:
the roughness of the water” pretty sure that is supposed to say roughness of pipes.