# Shower Drywall

**URL:** <https://forum.nachi.org/t/shower-drywall/170726>\
**Category:** Public Archive\
**Created:** [August 12, 2003, 12:00am UTC](https://forum.nachi.org/t/shower-drywall/170726 "2003-08-12T00:00:00Z")\
**Posts on this page:** 9\
**Page:** 1

<div class="post-metadata">

**Author:** ![system](https://global.discourse-cdn.com/internachi/original/3X/d/f/df7ced6a9ca05e7c93fa949dfc12a8c10d06c887.png) [@system](https://forum.nachi.org/u/system)\
**Post date:** [August 12, 2003, 12:00am UTC](https://forum.nachi.org/t/shower-drywall/170726/1 "2003-08-12T00:00:00Z")

</div>

**Originally Posted By: roconnor**  
**This post was automatically imported from our archived forum.**

* * *
  
The bldg code generally permits water resistant drywall (greenboard) back-up for tiles in a shower. However I understand that cement board (“Wonderboard”) is generally recommended for this application.  
  
  
Has anyone observed problems where greenboard (not standard drywall or blueboard) was used for shower tile back-up or know of any good articles that discuss this? ![icon\_question.gif](upload://t2zemjDOQRADd4xSC3xOot86t0m.gif)  

* * *
  

--  
Robert O'Connor, PE  
Eagle Engineering ?  
Eagle Eye Inspections ?  
NACHI Education Committee  
  
I am absolutely amazed sometimes by how much thought goes into doing things wrong

---

<div class="post-metadata">

**Author:** ![system](https://global.discourse-cdn.com/internachi/original/3X/d/f/df7ced6a9ca05e7c93fa949dfc12a8c10d06c887.png) [@system](https://forum.nachi.org/u/system)\
**Post date:** [August 12, 2003, 12:00am UTC](https://forum.nachi.org/t/shower-drywall/170726/2 "2003-08-12T00:00:00Z")

</div>

**Originally Posted By: ecrofutt**  
**This post was automatically imported from our archived forum.**

* * *
  
Robert,  
  
  
See following extracted from [www.hometime.com](http://www.hometime.com)  
  
Where the tile is installed by a good tile guy, I don't usually see problems in the first several years.  
  
Where the tile is installed by a non-professional who really is very good at it, I see problems frequently.  
  
Primarily due to the deterioration of the grout and the subsequent wetting of the greenboard.  
  
It is not a question of IF the greenboard will get wet and swell, its a question of how long will it be before it does.  
  
Concrete backerboard won't suffer like greenboard when it gets wet.  
  
Its a question of do it cheap or do it right.  

# EXTRACT:
  
Moisture-resistant drywall, or "greenboard" as it's often called, is made out of the same gypsum core as drywall. The only difference is that it has a moisture-resistant facing.  
  
Greenboard is sometimes used as an underlayment in wet areas such as a bathtub surround or shower. It's installed the same way as standard drywall.  
  
Keep in mind that greenboard is not water-proof. And if your tile is not sealed properly the greenboard may deteriorate from moisture penetration.  
  
Concrete backerboard has a solid concrete core and is faced on both sides with fiberglass. It's an ideal underlayment for wet areas like shower walls and bathtub surrounds  
=========================================  

* * *
  

--  
Erby Crofutt  
[B4U Close Home Inspections  
Georgetown, Kentucky](http://www.b4uclose.com)  
[www.b4uclose.com](http://www.b4uclose.com)

---

<div class="post-metadata">

**Author:** ![system](https://global.discourse-cdn.com/internachi/original/3X/d/f/df7ced6a9ca05e7c93fa949dfc12a8c10d06c887.png) [@system](https://forum.nachi.org/u/system)\
**Post date:** [August 15, 2003, 12:00am UTC](https://forum.nachi.org/t/shower-drywall/170726/3 "2003-08-15T00:00:00Z")

</div>

**Originally Posted By: Aaron Rosenbaum**  
**This post was automatically imported from our archived forum.**

* * *
  
greenboard = ![icon_confused.gif](https://global.discourse-cdn.com/internachi/original/3X/b/9/b9bc35e1fe092635ae12ff5d569e322135079dfa.gif)  
  
  
Cement backerboard/durarock =   

* * *

---

<div class="post-metadata">

**Author:** ![system](https://global.discourse-cdn.com/internachi/original/3X/d/f/df7ced6a9ca05e7c93fa949dfc12a8c10d06c887.png) [@system](https://forum.nachi.org/u/system)\
**Post date:** [August 31, 2003, 12:00am UTC](https://forum.nachi.org/t/shower-drywall/170726/4 "2003-08-31T00:00:00Z")

</div>

**Originally Posted By: janderson**  
**This post was automatically imported from our archived forum.**

* * *
  
Most building official’s and inspectors in this area will not allow greenboard to be installed because of the inherent problems associated with it.  

* * *
  

–  
Within the seeds of ignorance lie the fruits of denial

  
Jeremiah

---

<div class="post-metadata">

**Author:** ![system](https://global.discourse-cdn.com/internachi/original/3X/d/f/df7ced6a9ca05e7c93fa949dfc12a8c10d06c887.png) [@system](https://forum.nachi.org/u/system)\
**Post date:** [August 31, 2003, 12:00am UTC](https://forum.nachi.org/t/shower-drywall/170726/5 "2003-08-31T00:00:00Z")

</div>

**Originally Posted By: roconnor**  
**This post was automatically imported from our archived forum.**

* * *
  
The model building codes (e.g. IRC) allow greenboard, so unless there is a local restriction there is nothing an AHJ can do except point out the potential problem to designers. I think it can be agreed that cement board is a better installation, but there has to be clear documentation of a problem to even consider proposing a local restriction.  

* * *
  

–  
Robert O’Connor, PE  
  
  
Eagle Engineering ?  
  
  
Eagle Eye Inspections ?  
  
  
NACHI Education Committee

  
I am absolutely amazed sometimes by how much thought goes into doing things wrong

---

<div class="post-metadata">

**Author:** ![system](https://global.discourse-cdn.com/internachi/original/3X/d/f/df7ced6a9ca05e7c93fa949dfc12a8c10d06c887.png) [@system](https://forum.nachi.org/u/system)\
**Post date:** [August 31, 2003, 12:00am UTC](https://forum.nachi.org/t/shower-drywall/170726/6 "2003-08-31T00:00:00Z")

</div>

**Originally Posted By: rking**  
**This post was automatically imported from our archived forum.**

* * *
  
Robert,  
  
  
As Erby says "Do it cheap or do it right".  
The standard application up here is to use the greenboard period in the bathrooms. Some custom contractors use the concrete backboard but most do not because of the weight and difficulty cutting and screwing.  
I have seen some problems with the greenboard due to moisture, I always take the palm of my hand and sort of slap the tub surrounds all the way around searching for weak or soft spots.  
To date I have been lucky and I have not had any walls or tiles come falling down on me ![icon\_eek.gif](upload://yuxgmvDDEGIQPAyP9sRnK0D0CCY.gif)   

* * *
  

--  
Muskoka Home Inspections  
"Wisdom is the Anticipation of the Consequences"  
Steering Committee Member At Large

---

<div class="post-metadata">

**Author:** ![system](https://global.discourse-cdn.com/internachi/original/3X/d/f/df7ced6a9ca05e7c93fa949dfc12a8c10d06c887.png) [@system](https://forum.nachi.org/u/system)\
**Post date:** [September 7, 2003, 12:00am UTC](https://forum.nachi.org/t/shower-drywall/170726/7 "2003-09-07T00:00:00Z")

</div>

**Originally Posted By: Brad Wederquist**  
**This post was automatically imported from our archived forum.**

* * *
  
Here’s a little info if you’re still interested  
  
  
[http://www.constructiondefects.com/cd\_shower.asp](http://www.constructiondefects.com/cd_shower.asp)  

* * *

---

<div class="post-metadata">

**Author:** ![system](https://global.discourse-cdn.com/internachi/original/3X/d/f/df7ced6a9ca05e7c93fa949dfc12a8c10d06c887.png) [@system](https://forum.nachi.org/u/system)\
**Post date:** [September 9, 2003, 12:00am UTC](https://forum.nachi.org/t/shower-drywall/170726/8 "2003-09-09T00:00:00Z")

</div>

**Originally Posted By: roconnor**  
**This post was automatically imported from our archived forum.**

* * *
  
I agree with rking … seems like greenboard is the usual back-up material for a typical shower (thanks for the tip also).  
  
  
Thanks for the link Brad ... points out some important things to check. I'm always trying to learn more and stay current. I also found this link:  
  
[http://www.usg.com/Design\_Solutions/2\_5\_2\_interiorpanel.asp](http://www.usg.com/Design_Solutions/2_5_2_interiorpanel.asp)  
  
While the cement board is a better installation, cost is a factor. Seems like the greenboard can be successfully used if installed correctly.  

* * *
  

--  
Robert O'Connor, PE  
Eagle Engineering ?  
Eagle Eye Inspections ?  
NACHI Education Committee  
  
I am absolutely amazed sometimes by how much thought goes into doing things wrong

---

<div class="post-metadata">

**Author:** ![system](https://global.discourse-cdn.com/internachi/original/3X/d/f/df7ced6a9ca05e7c93fa949dfc12a8c10d06c887.png) [@system](https://forum.nachi.org/u/system)\
**Post date:** [September 21, 2003, 12:00am UTC](https://forum.nachi.org/t/shower-drywall/170726/9 "2003-09-21T00:00:00Z")

</div>

**Originally Posted By: jmyers**  
**This post was automatically imported from our archived forum.**

* * *
  
Just wanted to add to Robert’s statement “and properly maintained”.  
  
  
Joe Myers  

* * *