Sill Plate Attachment

Originally Posted By: mpearson
This post was automatically imported from our archived forum.



http://www.nachi.org/bbsystem/usrimages/more/167-6722_IMG%20(Small).JPG ]


[ Image: http://www.nachi.org/bbsystem/usrimages/more/167-6724_IMG%20(Small).JPG ]


Originally Posted By: roconnor
This post was automatically imported from our archived forum.







Robert O’Connor, PE


Eagle Engineering ?


Eagle Eye Inspections ?


NACHI Education Committee


I am absolutely amazed sometimes by how much thought goes into doing things wrong

Originally Posted By: psisler
This post was automatically imported from our archived forum.



Michael,


I have seen quite a few in my area that are just shot into the poured slab foundation as well as the raised foundation walls. Whether it is to code or not it sure doesn’t stop them from doing it up here in the sierras.


Patrick