Sub Panel

Originally Posted By: roconnor
This post was automatically imported from our archived forum.



Dont forget “tinknocker” or “hacker” for the HVAC guys, and I also heard “mud slinger” in my previous life as a mason. I like “sparkie” the best though.


Talk about "off topic" ... ![icon_lol.gif](upload://zEgbBCXRskkCTwEux7Bi20ZySza.gif)

Alan ... do you mean the house has a 100A 120/240V 1-phase 3-wire service (24,000 watt capacity), with a 100A 120V 1-phase 2-wire subpanel feeder (12,000 watt capacity)?


--
Robert O'Connor, PE
Eagle Engineering ?
Eagle Eye Inspections ?
NACHI Education Committee

I am absolutely amazed sometimes by how much thought goes into doing things wrong