What are the general provisions related to hydronic piping systems? How must floor heating systems be tested?

Hydronic systems require leak-tight, temperature-related piping with proper corrosion control, pressure relief, and insulation. Floor heating loops must be hydrostatically pressure tested with air or water before pouring concrete. A 100-psi pressure must be applied for 30 minutes before concrete fill

I use my infrared to verfiy operation, sometimes I can located main controls and piping all per type. I think determing pressure for 30 minutes is a little beyond our standards of practice. Exibiting knowledge is good, not quite needed in my inspection process though. I have manuals for most sytems just for my reference if things look a little fishy. AI?

the 30 minutes was before pouring concrete, a very reasonable timeframe to ensure it lasts. i’d rather blow a pipe before the concrete goes in than after.