What is wrong with these two scenarios??

Commercial: 240V 3 phase 200mps
This old (1956) building is now use for 12 small offices. It was used for an industrial facilitiy. We are doing a 4 Point.
Attached Thumbnailshttp://www.nachi.org/forum/attachments/f19/53313d1331085971t-wrong-these-two-scenarios-commercial-249-marlin-circle-thorsten-pfeffer-2012-018.jpg http://www.nachi.org/forum/attachments/f19/53314d1331086047t-wrong-these-two-scenarios-commercial-249-marlin-circle-thorsten-pfeffer-2012-029.jpg

I don’t commercial inspections but here goes
In pic one there is 3 or 4 wires on bank one
there is 3 or 4 wires on bank two
And bank 3 has only one as it should be

in pic 2 there are 3 wires on bank one
there is 3 wires on bank two
And bank 3 is not used

so how did I do

You failed. LOL

In the second photo, it looks like the smaller wire (1/0?) was run to the third lug and (2/0) was run to the neutral.