# What's Wrong Here?

**URL:** <https://forum.nachi.org/t/whats-wrong-here/5187>\
**Category:** Inspecting HVAC Systems\
**Created:** [June 21, 2006, 11:23am UTC](https://forum.nachi.org/t/whats-wrong-here/5187 "2006-06-21T11:23:41Z")\
**Posts on this page:** 1\
**Page:** 2

<div class="post-metadata">

**Author:** ![DSuelflow](https://avatars.discourse-cdn.com/v4/letter/d/53a042/32.png) [@DSuelflow](https://forum.nachi.org/u/DSuelflow)\
**Post date:** [June 29, 2006, 10:50pm UTC](https://forum.nachi.org/t/whats-wrong-here/5187/21 "2006-06-29T22:50:48Z")

</div>

As a recovering architect, I’d take issue with the first reply. In the 12 years I was in the business we never specified where the disconnects (or units for that matter) were to be placed. Normally, the PM&E sheets are drawn up and sealed by the engineers. These are typically schematic in nature and it is left up to the trades as to actual location. [FONT=Arial]The closest I ever got to placing PM&E stuff was when I would lay out ACT grids and lights. You are right however, Most architects do not give enough attention (or space) to mechanical rooms, service areas, etc.[/FONT]

[Previous page](https://forum.nachi.org/t/whats-wrong-here/5187.md?page=1)
