35 years a go, the house was built with the roof having a 24 in span between truss. which was a little spongie to walk on.
it was reshingled this year.
what would you tell your client ?
when the roof was reshingled they should have used thicker plywood to strenghten the roof.
or they should have added bracing to the truse already there or added more truss, while the roof was off.
any other ideas?