Alabama Code changes

If you build or inspect homes around Jasper, Walker County, or Birmingham, what are your local building officials telling you about jobs that carry over into 2027?

Starting January 1, 2027, Alabama law requires residential home builders to follow the applicable state residential code or the local residential code where one applies. The state’s August draft uses the 2024 IRC and 2024 IECC with Alabama amendments. The October 30 notice shows the rule was certified with changes, so the August draft is a preview of what to watch for. Alabama builder law · October 30 state notice

The part that caught my attention is the HVAC testing. The draft calls for duct leakage testing even when the ducts are inside conditioned space. It also proposes balanced mechanical ventilation when the blower-door result is 5.0 air changes per hour or less under the prescriptive path. That could affect how builders plan the HVAC system and schedule testing. August draft

The local differences are worth watching. Jasper already lists the 2024 IRC, Birmingham’s current technical code adopts the 2021 IRC with local amendments, and Walker County says it currently has no county structural building permit program. Jasper Building Inspections · Birmingham Building Codes · Walker County Engineering

Has anyone received written guidance on which code applies to a house permitted in 2026 and finished in 2027, or which test reports will be required at final inspection? If you have, please share the city or county and what they told you.

— Tim Thrasher, Centsable Inspections INC

Just curious, have you called or emailed them for clarification?