foundation.

Brick and concrete are water repelent or close to when new.
Absorption rates differ.
As the components age repair alternatives arise as in your post#9.
If concrete or brick can be made water tight what is the point of post #1
For Building sciences. I started this thread to see how many HI’S would respond.
I know the defects through recognition. I lack narrative on technical.
To post on subject matter that is relevant.
I hoped it would enlighten others and myself. If it does not catch. I will continue my quest for more.
Curiosity BOB. And my ignorance to technically verbalize.

Just to be clear.
Moisture will always go through the brick.
Foundation is bottom half of that wall in case you do not know that.
A good point would be to say what is on the other side of the wall.
We would not have had to have this exchange.
Then you can make a conclusion to the VDB and insulation to go on the inside Condo wall.

Hope the link works BOB.
When it comes to building science Dale or Brian MacNiesh Claude L well do better than I can.
Leave you with a though BOB.
I was and still am called as a exterior masonry and cement company to do repairs. Sump basins, foundations cracks.
They gave me the same problem as you just did.
Repair only part of the problem.
I never took the jobs. Wasted hours explaining to clients what had to be done to stop all deficiencies in the structure to be complete.
I have only xxx to do that they say. I give them a plain. WOW I hated it.
They still did not do the work right. I do not do them wrong.
I leave.:slight_smile: No more talk. Just good referrals at times…:slight_smile:

Never install insulation below three feet from grade in most areas. As was pointed out you are sure to trap moisture below the frost line and create mold on any cold surface.
When encountering a problem with mold always check with a moisture meter just above the carpet molding. If moisture is found then a complete gut of 4x8 sheet of drywall should be removed from this area and a 4x8 sheet of mold proof drywall added so repairs to the finish will be easier.:smiley:

If that is true what do you say about the wood flooring with substrate ?

At least 6 mill plastic is laid on top of the concrete (lapping up any walls) before any flooring is laid.

I agree with Kevin. The ground is your insulation.

Keep the substrate away from the wall. If the temperature is cold below three feet then you will need a wall wash of ventilation. If insulation is needed below this area it will mean the builder did not consider the bridging affect on the exterior wall.
Colder climates like our area can have styrofoam insulation glued to the foundation wall first for added comfort and then a stand off of about 1/2 an inch to prevent thermal bridging. The styrofoam does not need to go down the wall right to the bottom but should go below the area of comfort zone.:smiley:

Flooring can be done the same way. The difference is only in the vapor barrier between the concrete and styrofoam insulation. Most concrete has a vapor barrier before the pour but if not done right the basement floor will be wet from moisture migration through the floor. This is why basement floors should have a control for thermal bridging.:smiley:

Sorry for the deleting.
BOB the point of the post.
I have work cement trade installing footings footers and foundations.
Apprentice cement finisher. Long long ago.
I see is this setup almost every trade.
Insulation placed wrong in and in the foundation.
There are several mistakes made in the foundation illustration.
I wanted to discus these issues with home inspectors that have a building science educational background for a greater understanding and use for others and my technical narrative.

Interesting.
So if we can put a moisture barrier of 6 mil on the floor what would happen if we did the same at the wall and then used regular fiberglass batting between the plastic and the drywall with the plastic directly on the brick?.Would that not be the same as the floor or would mold appear on the plastic?

Would it be wise to paint the brick on the inside with dryloc type product?

Yes I did recommend replacing the floor in that whole unit and replacing the wood subfloor
Used this…

For flooring, there are basement subfloor
systems available that create an “air gap” below the floor with corrugated or cleated plastic
panels that are usually 2 x 2 foot interlocking panels. The plastic also acts as a moisture
barrier to help keep the finished floor dry.

For the walls which seemed to simply have a air gap with no evidence of that foam board other than a tiny piece you see in the picture I kept it rather generic.(cop out)?

Where wood framing contacts masonry, appropriately treated wood
should be selected. I suggest using mold and mildew resistant drywall for the walls. Vapor
barriers and insulation should be correctly installed.

The correctly installed part is the cop out.

Gravity takes over and the water runs down to the floor creating a pocket of moisture. The moisture is caused from internal and external.
Flooring moisture is caused from improper installation that is external in nature and will not create a problem unless hydrostatic pressure is too great to prevent migration of water through the concrete. Before installation of flooring a proper test of the concrete is needed by installing a sealed piece of vapor barrier for a day or two and observation of moisture is checked under the vapor barrier. This practice is way above a HI and must be done by foundation specialist.

Here is the right answer to the question: http://www.nachi.org/gallery/insulation_and_energy/foundation/interior-rim-joist-insulation-3d.jpg

That is how the old timers did it. Too bad that kind of construction is seldom followed.

I have never seen mold on plastic during this type of application but if there was, plastic is not porous enough for considered toxic mold to feed off of.

This is not a practice in my area. I never knew such a practice existed.

Now for another discussion.
I see grading for the gravel fill under both slab and french drain bedding being done wrong at times.
French drains being another grave issue if not installed properly.
A: being exterior grade B: being interior grade. A: has to be lower as not to cause hydrostatic pressure.
Note the KEY or Vcut in the center of the footing. To Stop water I have seen the key with a bracker rod ( 3’ circumference ) installed inside the key before the erection of the walls.
**
** Also keys are not notched properly. That v in the footer, foot print or strip footing.
You can rent scanners to find the footing and french drains.
Cameras that snake a french drain and take a recorded image.
This is something a HI can make money doing. It enlarges you business footprint.
Hydrostatic foundation basement issues and drainage issue, foundation crack evaluation.
May Nick can elaborate on the foundations course now given
photos of right and wrong

wrong way

http://http://chasingnetzero.blogspot.com/2010_08_01_archive.html ? Good link to view.

OK so you are a proponent of using rigid foam board directly on the brick ?

Closed cell?

Open cell I imagine would allow for evaporation but then the wall should not contact the foam.(correct)?

I love this subject because in Chicago we have basements and developers love converting by duplexing down into what was a regular unfinished basement with open walls and concrete floors with floor drains.Sometimes they leave the floor drains in and other times they seal them up with qa wood or tile floor though I never get to see how they were sealed internally. (imagine the smell if left open:)

Like Mr.Braun, I myself have never witnessed that form of building.
It looks interesting. I will surly study more. Thanks Nick.
Post # 22 link did not open Nick. See what you can tell me. I will look at my firewall again.

Now you see why I did not want to answer you BOB.
Remember you were a septic on mold. I am not.
Building science mate.
I need that technical terminology to make proper response.
Built, used, and worked with all that is going on in the conversation.
French workforce, I pickup by sight. I used VDB in 1984 errecting my first home.
I had them put it in.
Brian MacNiech reminded me of the term for the ( wind shear bracing channels ) placed in the framing. Will not forget now mate.

Infiltration of air comes through the rim joist due to stack affect and as Nick points out by the pictures all areas must be sealed with styrofoam or spray on Insulation.The wall will need to be studed and have a stand off to prevent thermal bridging. Closed cell is the best in this application.
Steel studs rust if not done correctly with proper insulation under the track.:smiley: