I am doing a four point in a house that has a previous roof leak, it has since been replaced, but it caused a lot of mold and required the owner to have a large part of the drywall removed in the house. The house is currently under construction. Is this a problem?
If some things are not how they should be with the A/C, Electrical, Plumbing or Roof.
If those things are fine then I would write it up as fine.
Just do your inspection as you always do. If there is an issue it is the insurance companies decision what to make of it.
Not yours
Good luck.
Thanks, appreciate it.