Crawlspace clearance?

Does anyone know the reccommended spec for dirt to joist and dirt to floor. I know tis is too tight but I can’t locate the #'s for my report. This one is 4" to joist and 14" to floor.

[li]12 inches between beams and the soil below[/li][li]18 inches between joists and the soil below[/li][li]6 inches between support post bases and the soil below[/li]Efforts should be made, such as grading and/or removing soil, to maintain these clearances. If this is not practical, then installing borate based Impel rods may help to prevent infestation and damage.

Gary

Thanks, Karl

That’s for untreated wood.

What Joe said