Framing

Originally Posted By: mroach
This post was automatically imported from our archived forum.



I inspected a house today that had a few rafters notched to accept a board then a few feet later it was attached to the header. Does any one know why they would have done this?






Thanks'
Mark


--
Mark Roach
A Professional Home Inspection
TREC# 6467
http://www.aprofessionalhomeinspection.com
"Your Best Protection is a Professional Home Inspection"
Klien Volunteer Fireman

Originally Posted By: rsummers
This post was automatically imported from our archived forum.



Mark we cant open the pictures?


Originally Posted By: mroach
This post was automatically imported from our archived forum.



I don’t know what the problem is. I have tried to upload them a couple of times with out any luck.



Mark Roach


A Professional Home Inspection


TREC# 6467


http://www.aprofessionalhomeinspection.com


“Your Best Protection is a Professional Home Inspection”


Klien Volunteer Fireman

Originally Posted By: roconnor
This post was automatically imported from our archived forum.



Mark … If you email the pics to me I can post them for you.


And for future reference there is a topic somewhere on posting pictures and quotes, where you can also test things out ... I think "Sticky Test" or something like that under Misc ... ![icon_wink.gif](upload://ssT9V5t45yjlgXqiFRXL04eXtqw.gif)


--
Robert O'Connor, PE
Eagle Engineering ?
Eagle Eye Inspections ?
NACHI Education Committee

I am absolutely amazed sometimes by how much thought goes into doing things wrong