Inspecting the Main Electrical Panelboard During a Home Inspection

I’ve think I’ve got it now but please someone correct me if I’m wrong. According to one of his posts on an older topic: Ground Rod tied to Neutral Bus.

The GEC is required to land on the neutral bus, not the EGC bus, when the MBJ is a screw.

@bgromicko1 is citing the code “by wire or busbar” but the image does not depict a wire or busbar as the MBJ

Edit:

1 Like