All of the hurricane ties on this new construction home are missing fasteners, have fasteners not placed in the top plate, have fasteners improperly driven into the top plate, or have split or chipped the wood caused by the fasteners. Other than this being a single top plate, What are your thoughts?
Inspecting framing on single top plate construction is different than a normal framing inspection.
It is a poor job of connector installation from what I can see.
In the bold above are good descriptives of what anomalies you have there.
That looks like a hot mess.
To put it simply . . . .wrong wrong wrong… write it up…
The rafter seat cut does not have full bearing on the wall.
One more thing your photos illustrate which annoys me. Those ties are poorly designed for that job. That’s not something we generally report, but it makes installing them difficult. For instance, in your first photo, because of hole placement, it is almost impossible to get a fastener adequately into the plate. Only one of the holes in the tie will bite into the meat of the plate. The other three are on the edge. Even with predrilling, the chance (risk) of split-out is significant. A different clip would have been a better choice.
Are they installed upside down?
I think that tie has the same pattern on both ends, though they come in left and right.
Each end is Identical.
Agreed. Something longer like this would have been better
It never ceases to amaze me how many “carpenters/framers” don’t know that.
They just used the wrong hurricane ties. These are the most commonly sold and cheapest in a box, but they’re for double top plates…Of course the nail holes are not going to line up properly and hit the edges of the top plate when you use it on a single plate…leaving each hurricane tie essentially useless. Should have used a strap type or other type of hurricane tie more suited for this geometry. You can’t expect laborers to actually use their heads
Well, in my experience, they still don’t work well with a double top plate, because they line up on the top plate. The bottom nails often are between the plates. The manufacturers illustrations don’t show them on 2X boards. I just think they are wrong for any use with 2X top plates.
3rd picture on the manufacturer’s website shows a double top plate. If the framer can’t install the wood wall tight to the truss/rafter and can’t get the straps to work…you realize that is a skill issue right?
I do think the H2.5As should be discontinued since they have the H2.5Ts now, which solve one of the underlying design problems with the H2.5As but the H2.5A is just too recognizable and sells too well. Shame on Simpson for that
Depending on what skill we are talking about. No skill level can make that tie work properly in the OP’s example. If the skill is selecting the correct bracket for the use, then sure. The photo you show with a notched rafter is not representative of the more common use with trusses.
Uh no, it’s exactly the same with respect to the 5 holes on the bottom flange of the tie. The wall itself doesn’t magically change shape when you use a rafter instead of a truss. It’s only what’s above the double top plate that changes. You are supposed to line up the tie with respect to the double top plates during the install.
If you match up the top of the double top plate of the wall to the “plate line” as engraved into the tie, the holes in the tie line up with the double top plates properly so the nails don’t go into the joints or edges of the plate.
If the double top plates aren’t installed right, there is a large wane in the wood at the edge, or other FRAMING problems, then yes it won’t work…and it’s the FRAMER’s responsibility to use other ties, add blocking, or line it up properly.
Here is a picture of the ties used on trusses:
If you line up the “plate line”, two of the nail holes won’t hit anything because you have a SINGLE top plate…that’s the whole reason the framer Tried to move the strap up which in turn shifts the “plate line“ up to get more holes to hit wood…and it didn’t work.
on that note, i was the network field engineer for a pipeline that went through the state. i was at one of the drop yards talking to one of the inspectors there. he told me about the time they had when the laborers were getting injured painting the pipe welds with epoxy paint. it was nasty stuff that you did not want to get on yourself. when he asked why they were burning their hands they informed him they were doing it right, just like the instructions told them to. turns out the paint said to apply it by hand (rather than spraying it)…