Your view on this installation

http://www.nachi.org/forum/attachment.php?attachmentid=25525&stc=1&d=1228425241

Anyone have any input on this pigtail installation on a new panel? The pigtail ? I have my own thoughts but like input from others.
Thanks

It is all legal as long as the pigtails are in the panel. Was this panel a upgrade?

Hi Greg,
Yes, upgraded from a Federal Pacific Stab-Lock.
Thanks for the reply. I just wanted to make sure. Sometime you get a brain fart.

Greg,
Did you get a call last week on a wind mit. inspection ?
I gave the customer your name.

Isn’t the sheathing supposed to be cut back to 1 inch? What’s with the wire ties?

It looked sloppy to me.

Looks like a common installation by any of our area electricians that install power demand boxes.