Draft image: Kick-out Flashing

I’ve attached a new draft image to preview, before finalizing. I’d like to hear any valuable feedback from the forum. Thanks for your help!

4 Likes

The underlayment should be over the drip edge at the eave edge.

6 Likes

Can you make the house wrap more crinkly so that it isn’t confused with metal flashing? I think you are fine to put the word “Tyvek®” on it at an angle in blue:

3 Likes

We have needed a good kick-out flashing illustration.

I agree with comments above.
Here’s my suggestion:

3 Likes

Thanks for the feedback, image has been updated. Hit Refresh!

2 Likes

I want to give @rmayo credit for this image. The reason why I posted it here is that I like the arrows indicating water flow. It would be a nice addition to your image, clarifying why and how this flashing works.

6 Likes

Image updated, showing the water path. Hit refresh.

Thanks!

3 Likes

Looks fantastic!

1 Like

Very nice!
IMO, you should remove the word “Roof” from “Roof underlayment”, (because it technically isn’t), and is a bit deceiving. I would simply rename it “Underlayment”.

4 Likes

I typically leave an inch or two between the bottom of siding and roofing material.

It makes it easier to re-roof and helps avoid water damage on wood siding.

Example:

3 Likes

There should be house wrap (shingle fashion from the bottom) at the area with the exposed wall sheathing directly behind the kick-out flashing. Typically around here, that area gets a pretreatment peel n stick flashing before all the other details (including the tyvek) shown are installed.

2 Likes

There are two reasons for these illustrations. One is so we can consider using them in our reports to help show our clients what a proper installation might look like. The other use is in NACHI educational material, so students can see a diagram of a proper installation.

In both cases, I think the diagrams tend to get too busy with information, and especially in the case of our clients, they may struggle to see what the main focus of the diagram is (in this case, the kickout flashing).

I would propose that you highlight the main subject of the illustration in some way, and also make the font for the primary topic bigger, or make it standout more. And maybe eliminate unnecessary information, like the labeling for the wall sheathing and siding, as an example.

(Yellow highlighting and red circle put on by me)

5 Likes

Unless in Florida. :wink:

4 Likes

And when it is under the drip edge, there should be a 4" bed of roof cement/mastic on top.

2 Likes

That’s why these “one size fits all” images will always be an issue, especially for new inspectors.

2 Likes

Image has been updated, hit refresh.

Thank you!

1 Like

That is exactly what I will use it for. This new illustration is better than the old one. I constantly see an inadequate kick-out with a 1/2” or 1” curb that does nothing to turn runoff into the gutter.

So thumbs-up from me to Zak and all you guys for contributing to make a better illustration.

2 Likes

Agreed Lon, this was a great collaboration to achieve results.

Thanks everyone!

Would un-labled version of images be helpful as an addition in the Gallery?

2 Likes

I think having one with far less labels would be helpful. Especially when we are using it in a report for a specific concern, like a missing kickout flashing. I think the kickout should be labeled, and I like the water arrows and the water label. Anything referenced in the labels should itself be labeled too. As an example, if “drip edge” is mentioned in the kickout label, then the drip edge should also be labeled.

I think having a simplified illustration for report use, in addition to the more complicated one for educational use, would be a great idea overall.

3 Likes