I believe I said this before.
Gerry is correct in his statement, and to add to that, it is also proper to install the drip edge on the roof substrate and then apply the ice and water shield on top of it.
It is also a standard to install the ice and water shield first and draping down the fascia if covered by another fascia component.
If the drip edge is installed over the ice and water shield, a 6" vycor should be applied on top to seal the aluminum drip edge and the ice and water shield.